AME has started working on a new job with a local waste water management facility. The main purpose of the job is to overhaul the engine foundation which has had structural failure. So far we have removed the engine rails from the foundation and brought them back to the shop to mill and allow for corrections for alignment. Once the structure has cured and set we will then re-install engine rails and align the engine to the reduction gear using the Rotalign Ultra Is.

Share The Story